You've probably seen the ads. 'Get ₹78,000 from the government for going solar.' But when you actually try to figure out how to apply, it feels overwhelming — portals, documents, DISCOMs, consumer numbers.
Don't worry. By the end of this guide, you'll know exactly what PM Surya Ghar is, who qualifies, what documents you need, and how the money actually reaches your bank account. If you install with Volta Solar, we handle every single step for you.
What Is PM Surya Ghar Muft Bijli Yojana?
Launched in February 2024 by the Government of India, PM Surya Ghar Muft Bijli Yojana is the country's largest residential rooftop solar mission. The target is to bring solar energy to 1 crore Indian households.
The scheme offers two key benefits:
It's not a loan. It's not a discount voucher. The government transfers actual cash to your bank after installation.
How Much Subsidy Do You Get?
The subsidy is calculated on the basis of system size:
| System Size | Subsidy Per kW | Total Subsidy |
|---|---|---|
| 1 kW | ₹30,000/kW | ₹30,000 |
| 2 kW | ₹30,000/kW | ₹60,000 |
| 3 kW | ₹30,000 for first 2 kW + ₹18,000 for 3rd kW | ₹78,000 |
| Above 3 kW | Subsidy capped at ₹78,000 | ₹78,000 (max) |
So whether you install a 3 kW or a 10 kW system, the maximum subsidy is ₹78,000.
Solar subsidy application portal
(Image placeholder)
Who Is Eligible for PM Surya Ghar Subsidy?
Eligibility is straightforward. You qualify if:
One subsidy is allowed per electricity meter number. Commercial connections and industrial connections are NOT eligible for this scheme.
Documents Required for PM Surya Ghar Application
Gather these before you begin:
Volta Solar collects these from you at the time of signing the installation agreement. You don't have to visit any office.
Step-by-Step Application Process
Step 1 — Register on the PM Surya Ghar Portal
Go to pmsuryaghar.gov.in. Click 'Apply for Rooftop Solar'. Enter your state, electricity distribution company (DISCOM), and consumer number. Register with your mobile number linked to Aadhaar.
Step 2 — Apply for Feasibility Approval
After registration, submit an application to your DISCOM (UPPCL, DVVNL, DHBVN, etc.) for feasibility approval. This is essentially asking the grid authority if your connection is suitable for solar. Approval typically takes 7–15 working days.
Step 3 — Install the Solar System
Once feasibility is approved, your MNRE-empaneled installer (that's us) installs the system. This takes 2–5 working days for a residential rooftop.
Step 4 — Apply for Net Meter
After installation, submit a net meter application to your DISCOM through the portal. The DISCOM sends a team to inspect and install the net meter. This step typically takes 15–30 days.
Step 5 — Submit Commissioning Certificate
Once the net meter is installed, your installer submits a commissioning certificate. Volta Solar handles this documentation entirely.
Step 6 — Subsidy Is Credited to Your Bank
After verification, the subsidy amount (up to ₹78,000) is transferred directly to your bank account. Timeline: typically 30–60 days after commissioning.
Net meter installation UP
(Image placeholder)
PM Surya Ghar in Uttar Pradesh — UPPCL Process
In UP, the application goes through UPPCL or your local DISCOM — DVVNL (Dakshin), PVVNL (Paschim), MVVNL (Madhyanchal), or PuVVNL (Poorvanchal). The process is the same but timelines may vary slightly by district.
Noida, Greater Noida, Ghaziabad — PVVNL
Lucknow, Kanpur — MVVNL
Agra, Mathura — DVVNL
Volta Solar has completed subsidy applications across all four UPDISCOMs. We know the local documentation quirks and follow up on your behalf until the money hits your account.
PM Surya Ghar in Gurugram & Haryana — DHBVN Process
In Gurugram, the DISCOM is DHBVN (Dakshin Haryana Bijli Vitran Nigam). Haryana residents follow the same national portal process but DHBVN has its own internal timelines.
Haryana also runs state-level top-up incentives for solar in addition to the central subsidy. Contact us to check what's currently available in your district.
Real Customer Story — Lucknow Family Saves ₹65,000 Per Year
Mr. Rakesh Sharma, a retired government employee in Gomti Nagar, Lucknow, installed a 3 kW system with Volta Solar in August 2025.
'Maine socha tha bahut complicated hoga — forms, offices, chakkar. Volta Solar ne sab kuch kar diya. Sirf documents dene the aur subsidy bank mein aa gayi.' — Mr. Rakesh Sharma, Lucknow
Common Mistakes to Avoid
Frequently Asked Questions
How long does PM Surya Ghar subsidy take to arrive in UP?
After the net meter is installed and commissioning certificate submitted, subsidy typically arrives within 30–60 days. In UP's major cities like Noida and Lucknow, Volta Solar customers have received subsidy in as little as 28 days.
Can I apply for PM Surya Ghar subsidy myself without an installer?
You can register on the portal yourself, but the installation must be done by an MNRE-empaneled installer to qualify for subsidy. Most customers let their installer handle the full process — it's faster and error-free.
Is PM Surya Ghar subsidy taxable?
No. The PM Surya Ghar subsidy is a direct benefit transfer and is not treated as taxable income under current Income Tax rules. However, always consult your CA for your personal situation.
Can tenants apply for PM Surya Ghar subsidy?
Yes, but the electricity connection and subsidy application must be in the name of the account holder. If you're a tenant, your landlord must give written consent, and the connection should be in your name.
What happens if my DISCOM rejects the net meter application?
Rejections are rare but do happen due to paperwork issues. Volta Solar resubmits and follows up with the DISCOM directly. We have dedicated liaison officers for UPPCL, DVVNL, and DHBVN.
Let Volta Solar Handle Everything
From portal registration to subsidy disbursal, Volta Solar manages the entire PM Surya Ghar application process for every customer in Noida, Gurugram, Ghaziabad, and across UP.
You focus on saving electricity. We handle the paperwork.
📞 Call us: +91 93359 35751
Book your free site survey today. We'll assess your roof, design the right system, and start your subsidy application on Day 1 of installation.